- Home
- 2 Seater Sofas
- LY-042 S-Curved Chenille Sectional Sofa: Dual-Depth (21.3" & 26.8"), Coral Pink, No Assembly, Compact For Small Spaces, 400 Lbs, 66.9" L Wooden Bazar
LY-042 S-Curved Chenille Sectional Sofa: Dual-Depth (21.3" & 26.8"), Coral Pink, No Assembly, Compact For Small Spaces, 400 Lbs, 66.9" L Wooden Bazar
Regular price
₹ 45,000
₹ 45,000
Sale price
Regular price
Tax included.
Shipping calculated at checkout.
Real Product Images
Description
LY-042 S-Curved Chenille Sectional Sofa
Bring sculptural style and cozy comfort to your space with the LY-042 S-Curved Chenille Sectional Sofa. Inspired by the flowing balance of Tai Chi and Yin-Yang forms, its distinctive S-curved silhouette creates an artistic focal point while maximizing seating in compact spaces. Upholstered in soft, woodgrain-textured chenille, it offers a luxurious feel with lasting durability. The dual-depth design provides versatile seating, while high-resilience foam delivers balanced support and helps the cushions maintain their shape over time. This 1-piece sofa arrives compressed and requires no assembly, making setup simple and convenient.
Features
-
Tai Chi-Inspired S-Curved Design: Flowing curves create a distinctive sculptural look inspired by harmony and balance.
-
1-Piece Design: Includes one complete sectional sofa for a simple and streamlined setup.
-
No Assembly Required: Simply unpack and allow the sofa to decompress before use.
-
Luxurious Chenille Upholstery: Soft, woodgrain-textured chenille adds warmth, comfort, and sophisticated visual appeal.
-
Dual-Depth Seating: Features two seating depths of approximately 21.3" and 26.8" for versatile lounging positions.
-
Space-Saving Profile: The compact 66.9" length makes it well suited for apartments, offices, lounges, and café corners.
-
High-Resilience Foam: Supportive cushioning offers balanced comfort while helping maintain its shape with regular use.
-
Includes Throw Pillows: Two coordinating pillows provide additional lumbar support and complete the look.
-
Easy Setup: Compressed packaging makes transportation and placement more convenient.
-
Weight Capacity: Supports up to 400 lbs.
Dimensions & Specifications
-
Overall Dimensions: 25.6" H × 66.9" W × 40.2" D
-
Seat Back Height: 0.01" H
-
Seat Height: 0.01" H
-
Seat Depth: 0.01" D
-
Delivery & return policy
Our team will ship your order within 5 business days. The time it takes to receive your order depends on the shipping method chosen at checkout.
We hope you to love it, but if you need to make a return, breathe easy. Returns are always free and can be done in person or by mail.
Projects from Pan India
You may also like
Space-Saving Corner Nook Dining Table Set
Regular price
₹ 50,000
₹ 50,000
-44%
Sale price
Regular price
Hevals Round Wooden 5ft Dining Table with 6 Linen Dining Chair
Regular price
₹ 104,000
₹ 104,000
-30%
Sale price
Regular price
Brown
Natural
White
Kelbaggi Modern Round Wooden Dining Set - Wooden Bazar
Regular price
₹ 75,000
₹ 75,000
Sale price
Regular price
Canizor 4 Seater Faux Marble and Wood Dining Table Set with Boucle Chairs
Regular price
₹ 75,000
₹ 75,000
Sale price
Regular price
Black Top
White Top
Round Farmhouse Dining Set, Wooden Dining Table with Linen Dining Chair for 4 for Small Space
Regular price
₹ 85,000
₹ 85,000
Sale price
Regular price
Brown
Natural
Divaark Round Dining Table Set With 4 Upholstered Dining Chairs For Living Room
Regular price
₹ 60,000
₹ 60,000
Sale price
Regular price
Dicaos 4 Seater Pedestal Dining Table Set - Wooden bazar
Regular price
₹ 75,000
₹ 75,000
Sale price
Regular price
Caroon Round Farmhouse Dining Table Set for 4 with Velvet/Corduroy Chairs - Wooden bazar
Regular price
₹ 50,000
₹ 50,000
Sale price
Regular price
Mid-Century Round Pedestal Kitchen Dining Table Set With 4 Upholstered Chairs
Regular price
₹ 65,000
₹ 65,000
Sale price
Regular price
Dining Table Sets With 52'' Round Table & 4 Upholstered Solid Wood Chairs
Regular price
₹ 68,000
₹ 68,000
Sale price
Regular price
BESTSELLING COLLECTIONS
Looks Vanity Dressing Table with mirror & lights with 13 storage drawers
From ₹ 35,299
₹ 48,000
Wooden Bazar Denesha Vanity dressing table design wood with mirror with stool
From ₹ 28,500
₹ 57,999
Sedanur Vanity Dressing Table With Chair Wooden Bazar
From ₹ 28,999
₹ 49,899
Kusiak Vanity Dressing Table - Wooden Bazar
From ₹ 27,999
₹ 44,999
Cashew Modern Black Makeup Vanity Set Dressing Table with Lighted Mirror Cabinet & Stool
From ₹ 28,999
₹ 62,999
Wooden Bazar Freya Vanity dressing table with mirror
From ₹ 31,499
₹ 65,000
Braison Vanity dressing table with mirror & stool
From ₹ 28,499
₹ 48,000
Lunell Farmhouse Makeup Vanity Dressing table with Lighted Mirror
From ₹ 28,499
₹ 52,000
Recommended Products
Wooden Bazar
Recliner Teak Wood Rocking Chair with Footrest
Regular price
₹ 14,999
₹ 14,999
-53%
Sale price
Regular price
(No reviews)
Beige
Green
Brown
Grey
Wooden Bazar
Leeanaz Swivel Faux Leather Counter & Bar Stools - Wooden bazar
Regular price
From ₹ 16,000
From ₹ 16,000
-64%
Sale price
Regular price
(No reviews)
Black
Beige
Green
Wooden Bazar
Wooden and Iron Rocking Chair Fully Foldable Premium Quality
Regular price
From ₹ 6,999
From ₹ 6,999
-38%
Sale price
Regular price
(No reviews)
Wooden Bazar
Kimchi Teak Wood Arm Chair In Walnut Finish
Regular price
₹ 12,499
₹ 12,499
-50%
Sale price
Regular price
(No reviews)
Yellow
Green
begie
Wooden Bazar
Lagos Recliner Teak Wood Rocking Chair
Regular price
₹ 17,000
₹ 17,000
-39%
Sale price
Regular price
(No reviews)
Dark Brown
Seira Blue
Hot Red
Sunset Orange
Light brown
Wooden Bazar
Hendrix 30'' Wide Velvet Barrel Chair (Set of 2)
Regular price
₹ 21,999
₹ 21,999
-33%
Sale price
Regular price
(No reviews)
Blue
Black
Fushia
Gray
Green
Ivory
Mustard
Pink
purple
light blue
orange
Wooden Bazar
Velvet Round Arm Curved Sofa - Wooden Bazar
Regular price
₹ 27,999
₹ 27,999
-39%
Sale price
Regular price
(No reviews)
Orange
Beige
Pink
Brown
Gray
Wooden Bazar
Chekare Dhizaini Solid Sheesham Wood Grandpa Rocking chair
Regular price
₹ 11,999
₹ 11,999
-50%
Sale price
Regular price
(No reviews)
Wooden Bazar
Wooden Bazar Flutura Vanity Dressing Table with mirror modern dressing table designs for bedroom
Regular price
₹ 26,999
₹ 26,999
-41%
Sale price
Regular price
(No reviews)
White
Grey
Green
Pink
White with curved mirror
Wooden Bazar
Looks Vanity Dressing Table with mirror & lights with 13 storage drawers
Regular price
₹ 35,299
₹ 35,299
-26%
Sale price
Regular price
(No reviews)
Wooden Bazar
Tammy Ergonomic Faux Leather Executive Chair
Regular price
₹ 19,999
₹ 19,999
-37%
Sale price
Regular price
(No reviews)
Camel
Brownish Grey
Coffee
Cream
Black
Wooden Bazar
Salma Wide Tufted Lounge Chair Recliner with Ottoman
Regular price
₹ 22,499
₹ 22,499
-31%
Sale price
Regular price
(No reviews)
Green
Blue
Gray
Pink
Brown
Dark Pink
Wooden Bazar
Fuhr Tufted Armless Chaise Lounge | Armless Recliner sofa
Regular price
₹ 14,999
₹ 14,999
-39%
Sale price
Regular price
(No reviews)
Granite
Linen
Slate
Wooden Bazar
Johnnathon Velvet Left-Arm Chaise Recessed Arms
Regular price
₹ 24,999
₹ 24,999
-23%
Sale price
Regular price
(No reviews)
Pink
Cream
Black
Gray
Green
Wooden Bazar
Rocking and Recliner Chair Wooden arm for Living Room
Regular price
From ₹ 13,999
From ₹ 13,999
-44%
Sale price
Regular price
(No reviews)
Grey
Navy Blue
Sky Blue
White
Yellow
